The excavation of the pond begins
The pool starts to take shape
curtain drain installation
Drainage and soakaway trenches are dug
pool excavation
Construction of block work walls
completion of block work
liner and pipework installed
feature rocks craned into place
pool nears completion
aquatic planting and gravel beds filter the water
1 month after pool completion